China Yangtze Three Gorges Project
Development Corporation (CTGPC)
Upon the approval of the State Council, China Yangtze
Three Gorges Project Development Corporation (CTGPC) was
formally established on Sep. 27, 1993 in Yichang, Hubei
Province in order to construct the Three Gorges Project
and develop Yangtze River.
CTGPC is a state-owned enterprise which is responsible
for its own profits and losses, and has the position of
legal person. CTGPC is the owner of the Three Gorges Project,
who will be fully responsible for the project construction,
fund raising and loan repaying, as well as the operation
administration after the construction. GeZhouBa Hydropower
Plant is its subsidiary. As the owner of Three Gorges
Project, China Yangtze Three Gorges Project Development
Corporation will better administrate its construction
and operation with mechanism of socialist market economy.
The project administration will use the mode of responsibility
taking by project owner, contract awarding by bidding,
construction supervision and contract management. The
procurement of materials and equipment for project construction
use the method of combining the uniform purchasing by
state plan and purchasing by bidding. Applying the contract
awarding by bidding is for the purpose of introducing
the competition to choose the best civil engineering contractor
for construction and procure the materials and equipment
with best price and quality via public bidding, fair competition,
justified evaluation. During the construction the contract
administration, project construction supervision are strictly
implemented, project quality, schedule and cost are strictly
and perfectly controlled, for the purpose that the project
construction will get best economic profits.
The Corporation will also be engaged in the development
of hydro resources along the Yangtze River, carry out
the research and technical consultancy in water conservancy
and hydropower science, and other various operation activities.
After the completion of the Three Gorges Project contruction,
CTGPC will own 20915 MW installation capacity and the
annual electricity output is 100 TWH. The gigantic economic
profits enable China Yangtze Three Gorges Project Development
Corporation to repay off all the debts arising from the
construction of Three Gorges Project. After the completion
of the project construction, CTGPC will continue to further
develop water resources of the stream and branches at
the upstream of Yangtze River by constructing XiLuodu,
XiangJiaBa and a series of other huge hydro power stations
in order to accelerate harnessing and developing the Yangtze
River.
CNAEC.org.cn
Address: 11/F, East Wing of Sichuan Mansion,
No.1 Fuchengmenwai Street, Beijing 100037 China
Phone:
+86-10-6833-2683 Fax: +86-10-6836-4843